Ritz Carlton Hotel

Scope of Works
  • High Reach Demolition
  • Saw Cutting
  • Hazardous Waste Removal
  • Low Noise and Vibration Impact operations.
  • The Ritz Carlton
  • KCE
  • 2.7 Million
  • 4 Months
  • Mathew Thornton
  • Robert Smith
  • Uncategorized