Port Rashid

Scope of Works
  • Qauy Wall and Port Side Demolition
  • Structure Demolition
  • Saw and wire cutting
  • Structural Dismantling
  • Asbestos removal
  • Concrete Recycling
  • Ashpalt & Paving removal
  • Structural Engineering
  • Civil Engineering
  • Nakheel
  • GTS
  • 36 Million
  • 14 Months
  • Robert Smith
  • Edward Forero
  • Uncategorized