Dubai Mall Fashion Avenue

Scope of Work
  • Saw Cutting
  • Floor by Floor Demolition
  • Structural Demolition
  • Facade Removal
  • Structural Engineering
  • Propping Systems
  • Structural Engineering
  • PT Slab Demolition
  • Cut and Lift
Project Summary

GTS were employed to demolish the Helix car park and associated VIP structures attached to Dubai Mall to make way for the new Fashion Avenue Expansion which now houses high end retail outlets. The structures for removal were attached to the live shopping mall and therefore consideration had to be made for choosing appropriate methods of demolition for each specific area. During the demolition of the Helix car park we had to implement propping systems to ensure that the Mall Hospital Clinic was not effected during our huge demolition operations. To complete the project successfully we used a number of methods for demolition which included, traditional heavy demolition with heavy equipment, concrete crushing with specialist demolition processors, saw cutting and coring and a variety of cut and lift operations to prevent vibration or disturbance to live elements of the mall adjacent to where we were working.

  • EMAAR
  • AFC
  • 10.5 Million
  • 12 Months
  • Mathew Thornton, Robert Smith
  • Edward forero
  • Uncategorized