Scope of Works
  • High Reach Demolition
  • Saw Cutting
  • Hazardous Waste Removal
  • Low Noise and Vibration Impact.


Project Summary

GTS were employed to demolish a number of structures which were located adjacent to the live school. One of the structures were was a twenty meter water tower which if it had failed may have caused serious injury or damage to the facility. In order to deconstruct the tower the tower safety GTS employed its High Reach Technology and carefully dismantled the structure working from the top down.

CLIENT

The British School

MAIN CONTRACTOR

Wates International

VALUE

1.2 Million

DURATION

3 Months

PROJECT MANAGER

Arman Andreas

PROJECT DIRECTOR

Robert Smith

CATEGORY

Uncategorized